Up to 6 Quattros can operate in parallel to achieve higher power output. Three-phase or split phase operation is also possible. Please check our datasheets to see which models have to parallel, three-phase, and split phase capabilities.
Remote Monitoring and Control
Monitor and control your Quattro and system or systems' locally (LAN) or remotely via the internet from anywhere in the world, using the free VRM app and free VRM portal website. Access can be from a phone, tablet, laptop, or PC for multiple operating systems. There is no end to the level of control, via the required Color Control GX or Venus GX, from adjusting your Quattro to setting a Geofence for-hire vehicles and more.
Two AC inputs with integrated transfer switch
The Quattro can be connected to two independent AC sources, for example, the public grid and a generator, or two
generators. The Quattro will automatically connect to the active source.
Split phase and three-phase capability
Two units can be configured for a split-phase, and three units can be configured for three-phase output. But that’s not all: up to 6 sets of three units can be parallel connected to provide 144kW / 180kVA inverter power and more than 2500A charging capacity. For more detail please enter parallel in the search box on our website.
PowerControl – Dealing with limited generator, shore side or grid power
The Quattro is a very powerful battery charger. It will, therefore, draw a lot of current from the generator or shore side supply (16A per 5kVA Quattro at 230VAC). A current limit can be set on each AC input. The Quattro will then take account of other AC loads and use whatever is spare for charging, thus preventing the generator or mains supply from being overloaded.
PowerAssist – Boosting shore or generator power
This feature takes the principle of PowerControl to a further dimension allowing the Quattro to supplement the capacity of the alternative source. Where peak power is so often required only for a limited period, the Quattro will make sure that insufficient mains or generator power are immediately compensated for by power from the battery. When the load reduces, the spare power is used to recharge the battery.
Solar energy: AC power available even during a grid failure
The Quattro can be used in off-grid as well as grid-connected PV and other alternative energy systems.
Loss of mains detection software is available.
On-site Monitoring and control
Several options are available: Battery Monitor, Multi Control Panel, Color Control GX, or other GX devices, smartphone or tablet (Bluetooth Smart), laptop, or computer (USB or RS232).
Remote Monitoring and control
Color Control GX or other GX devices.
Data can be stored and displayed on our VRM (Victron Remote Management) website, free of charge.
Remote configuring
When connected to the Ethernet, systems with a Color Control GX or other GX device can be accessed and settings can be changed remotely.